| |
Web URL(s): | http://www.actahort.org/books/783/783_61.htm Last checked: 06/11/2008 Access conditions: Item is within a limited access website |
Publication Type:
| Report |
Author(s): | Nektarios, P. A.;
Ntoulas, N. |
Title: | Olympic Stadium construction for the Athens Olympic Games 2004 using modular turf |
Meeting Info.: | Proceedings of the II International Conference on Turfgrass Science and Management for Sports Fields: Beijing, China, June 24-29, 2007. |
Source: | Acta Horticulturae. Vol. 783, February 2008, p. 589-600. |
Publishing Information: | Leuven, Belgium: International Society for Horticultural Science |
# of Pages: | 12 |
Keywords: | TIC Keywords: Sports turf construction; Stadia; Special events; Portable turf; Installation
|
Abstract/Contents: | "The Olympic Games is the most spectacular sport event of the world and demands a combination of art and athletic games. Both types of events are taking place at the same stadium within a compressed time interval. Therefore, there was a need to utilize modern technologies to permit fast establishment of the Olympic Stadium turfgrass pitch just after the termination of the opening ceremony. The following work describes the case study of installing a removable modular turf system for the 2004 Olympic Games in Athens, Greece. The study and the quality control for the whole project were assigned by the stadium construction joint venture to the Dep. of Floriculture and Landscape Architecture of the Agricultural University of Athens. The study specified the drainage and root zone materials, the turfgrass species and variety, as well as the methodology for constructing, managing, transporting and installing the modular turfgrass system. In addition, the study included the design and specifications for the irrigation and drainage system of the turfgrass pitch. The whole project of transporting and constructing the turfgrass pitch during the Olympic Games of Athens 2004 was completed successfully within 65 hrs and withstood 14 days of demanding track and field events as well as the soccer gold medal final game. After the Olympic Games the flexibility of the modular turfgrass system permitted a partial move of the center of the pitch to facilitate the stage scenery for the Paraolympic opening ceremony." |
Language: | English |
References: | 0 |
| ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete): Nektarios, P. A., and N. Ntoulas. 2008. Olympic Stadium construction for the Athens Olympic Games 2004 using modular turf. Acta Horticulturae. 783:p. 589-600. |
| Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=136461 |
| If there are problems with this record, send us feedback about record 136461. |
| Choices for finding the above item: |
| Web URL(s): http://www.actahort.org/books/783/783_61.htm Last checked: 06/11/2008 Access conditions: Item is within a limited access website |
| MSU catalog number: SB 13 .A25 no. 783 |
| Find from within TIC: Digitally in TIC by record number. |
| Request through your local library's inter-library loan service (bring or send a copy of this TGIF record) |