Full TGIF Record # 142885
Item 1 of 1
Web URL(s):http://sportsturfonline.com/2008/11/19/how-to-get-a-sports-field-ready-in-70-days/5042/
    Last checked: 12/10/2015
http://sturf.lib.msu.edu/article/2008nov8.pdf
    Last checked: 12/16/2009
    Requires: PDF Reader
Publication Type:
i
Professional
Author(s):Vanini, J. Tim; Rogers, John N. III
Author Affiliation:Vanini: Director, Big Green Initiative, Nichols School, and President, New Dimensions Turf, Incorporated, Buffalo, New York; Rogers: Professor, Crop and Soil Sciences, Michigan State University
Title:How to get a sports field ready in 70 days
Section:Field science
Other records with the "Field science" Section
Source:SportsTurf. Vol. 24, No. 11, November 2008, p. 8, 10, 12.
Publishing Information:Chicago, IL: Bev-Al Communications (m2media360)
# of Pages:3
Keywords:TIC Keywords: Application rates; Athletic fields; Best management practices; Establishment; Fertilization; Game preparation; Lolium perenne; Mowing height; Percent living ground cover; Playability; Poa pratensis; Shear resistance; Sodding; Traffic simulation
Abstract/Contents:Suggests that "the 70-day summer window is ideal for sports fields to actively grow and repair themselves." Presents a study conducted to "clarify the impact of best management practices in regards to mowing height and fertilization on re-establishment of sports field turf during a 70-day window." Details the study, stating that "germination blankets were placed over the top of the plot and removed 15 days after seeding in both [2002 and 2003]." Reports that "mowing height only detected differences at the end of the 70-day trial...for turfgrass cover percent...There were differences among fertilizers for every date regardless of traffic and non-traffic areas." Concludes that "The Cady Traffic Simulator (CTS) is a more aggresive machine compared to traditional wear machines to date."
Language:English
References:0
See Also:See also related dissertation, Strategies and Analysis of Management Practices for Sports Fields in Michigan, 2006, R=286233. R=286233
Note:Reprint appears in Sport Turf Manger, 23(1) Spring 2010, p. 15-19
Includes sidebar, "Take-home message", p. 10
Pictures, color
Tables
ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete):
Vanini, J. T., and J. N. III Rogers. 2008. How to get a sports field ready in 70 days. SportsTurf. 24(11):p. 8, 10, 12.
Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=142885
If there are problems with this record, send us feedback about record 142885.
Choices for finding the above item:
Web URL(s):
http://sportsturfonline.com/2008/11/19/how-to-get-a-sports-field-ready-in-70-days/5042/
    Last checked: 12/10/2015
http://sturf.lib.msu.edu/article/2008nov8.pdf
    Last checked: 12/16/2009
    Requires: PDF Reader
Find Item @ MSU
MSU catalog number: b2472380a
Request through your local library's inter-library loan service (bring or send a copy of this TGIF record)