Author(s):Line, D. E.; White, N. M.
Author Affiliation:Line: Extension Specialist, Biological and Agricultural Engineering Department; White: Research Director, Extension and Sponsored Programs, College of Design, North Carolina State University, Raleigh, North Carolina
Title:Efficiencies of temporary sediment traps on two North Carolina construction sites
Section:Soil & water
Other records with the "Soil & water" Section
Source:Transactions of the ASABE. Vol. 44, No. 5, September/October 2001, p. 1207-1215.
Publishing Information:St. Joseph, MI: American Society of Agricultural and Biological Engineers
# of Pages:9
Keywords:TIC Keywords: Sediment control; Sediment pollution; Sedimentation; Erosion control; Water quality; Construction; Phosphorus; Turbidity
Abstract/Contents:"Sediment export from construction sites is receiving increasing scrutiny, and correspondingly the efficiencies of sediment controls are being questioned. Sediment or total suspended solids (TSS) and total phosphorus (TP) concentrations in outflow from, as well as sediment accumulation, in three temporary sediment traps located on North Carolina construction sites were monitored to assess the efficiencies of the traps. The trapping efficiency of the trap located on a Coastal Plain site (Woodsong) was 69%, while the efficiencies of two traps located on a Piedmont site (Carpenter) averaged 59%. In addition, the Carpenter trap retained 30% of the TP coming off the site, while the Woodsong trap retained 9%. Sediment size analyses of a limited number of samples indicated that the Woodsong trap retained 91%, 43%, and 21% of the sand, silt, and clay primary particles entering the trap, while the Carpenter traps retained 68%, 72%, and 40% of the sand, silt, and clay particles entering it. The turbidity of outflow samples was also measured and correlated to TSS concentrations. A relatively strong linear correlation was found for data from the Carpenter traps (r 2=0.96), and a weaker correlation was documented for the Woodsong trap (r2 =0.64). These data indicate that for sites with high TSS concentrations in runoff and relatively little organic matter left on the site, TSS may be computed from turbidity; however, more data is needed to confirm this assertion."
Language:English
References:16
Note:Figures
Tables
Graphs
ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete):
Line, D. E., and N. M. White. 2001. Efficiencies of temporary sediment traps on two North Carolina construction sites. Trans. ASABE. 44(5):p. 1207-1215.
Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=143900
If there are problems with this record, send us feedback about record 143900.
Choices for finding the above item:
Web URL(s):
http://elibrary.asabe.org/azdez.asp?JID=3&AID=6451&CID=t2001&v=44&i=5&T=1&redirType=
    Last checked: 10/08/2013
    Access conditions: Item is within a limited-access website
http://elibrary.asabe.org/azdez.asp?JID=3&AID=6451&CID=t2001&v=44&i=5&T=2&redirType=
    Requires: PDF Reader
    Access conditions: Item is within a limited-access website
Find Item @ MSU
MSU catalog number: S 671 .A452
Find from within TIC:
   Digitally in TIC by record number.
Request through your local library's inter-library loan service (bring or send a copy of this TGIF record)