Full TGIF Record # 171732
Item 1 of 1
Web URL(s):http://archive.lib.msu.edu/tic/updat/article/2006mar13.pdf
    Last checked: 01/05/2011
    Requires: PDF Reader
Publication Type:
i
Newsletter
Author(s):Connell, Sean
Author Affiliation:President, Georgia Golf Construction, Inc. and Member, SFMANJ Board of Directors
Title:Constructing an athletic field
Source:Update [New Jersey]. Vol. 6, No. 2, March/April 2006, p. 13.
Publishing Information:Pennsville, NJ: Sports Field Managers Association of New Jersey
# of Pages:1
Keywords:TIC Keywords: Construction specifications; Contract services; Decision-making; Job costing; Reconstruction costs; Sports turf construction
Abstract/Contents:Discusses the potential importance of accurately estimating the cost of constructing an athletic field, suggesting that "the great differences in price usually are dependent upon several key factors: earthmoving, drainage, sod versus seed, and irrigation." Recommends for the customer to "quantify all areas that need to be addressed before construction starts...[and] obtain the services of a design engineer." Suggests providing the contractor with all the information possible in order to receive a more accurate price estimate. Concludes that "an ill-prepared plan is more likely to sabotage the project even before construction."
Language:English
References:0
ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete):
Connell, S. 2006. Constructing an athletic field. Update [New Jersey]. 6(2):p. 13.
Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=171732
If there are problems with this record, send us feedback about record 171732.
Choices for finding the above item:
Web URL(s):
http://archive.lib.msu.edu/tic/updat/article/2006mar13.pdf
    Last checked: 01/05/2011
    Requires: PDF Reader
Find Item @ MSU
MSU catalog number: b7874780
Request through your local library's inter-library loan service (bring or send a copy of this TGIF record)