| |
Web URL(s): | http://digital.tudor-rose.co.uk/golf-course-architecture/gca-magazine/issue35/files/assets/common/downloads/publication.pdf#page=6 Last checked: 04/25/2017 Requires: PDF Reader Notes: Item is within a single large file http://digital.tudor-rose.co.uk/golf-course-architecture/gca-magazine/issue35/index.html#10-11 Last checked: 04/25/2017 Requires: Adobe Flash Notes: Item is within a single large file http://www.golfcoursearchitecture.net/Article/Trump-Links-at-Ferry-Point-nears-public-opening-as-construction-work-concludes/2914/Default.aspx#.UzWhpfldXh4 Last checked: 03/28/2014 Notes: Variant title "Trump Links at Ferry Point nears public opening as construction work concludes" |
Publication Type:
| Professional |
Author(s): | Anonymous |
Title: | Construction work completed at Trump's Ferry Point course |
Section: | Tee box Other records with the "Tee box" Section
|
Source: | Golf Course Architecture. Vol. 35, January 2014, p. 9. |
Publishing Information: | Leicester, England, United Kingdom: Tudor Rose |
# of Pages: | 1 |
Keywords: | TIC Keywords: Course profile; Golf course construction; Golf course design; Links
|
Facility Names: | Ferry Point Park, in New York, New York |
Language: | English |
References: | 0 |
Note: | Pictures, color |
| ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete): Anonymous. 2014. Construction work completed at Trump's Ferry Point course. Golf Course Archit. 35:p. 9. |
| Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=238008 |
| If there are problems with this record, send us feedback about record 238008. |
| Choices for finding the above item: |
| Web URL(s): http://digital.tudor-rose.co.uk/golf-course-architecture/gca-magazine/issue35/files/assets/common/downloads/publication.pdf#page=6 Last checked: 04/25/2017 Requires: PDF Reader Notes: Item is within a single large file http://digital.tudor-rose.co.uk/golf-course-architecture/gca-magazine/issue35/index.html#10-11 Last checked: 04/25/2017 Requires: Adobe Flash Notes: Item is within a single large file http://www.golfcoursearchitecture.net/Article/Trump-Links-at-Ferry-Point-nears-public-opening-as-construction-work-concludes/2914/Default.aspx#.UzWhpfldXh4 Last checked: 03/28/2014 Notes: Variant title "Trump Links at Ferry Point nears public opening as construction work concludes" |
| MSU catalog number: b5218124 |
| Find from within TIC: Digitally in TIC by file name: garch2014jan Digitally in TIC by record number. |
| Request through your local library's inter-library loan service (bring or send a copy of this TGIF record) |