Full TGIF Record # 112435
Item 1 of 1
Web URL(s):https://stri.lib.msu.edu/vol35-1959/pdf/sptri59035090.pdf#page=5
    Last checked: 07/07/2006
    Requires: PDF Reader
    Notes: Available to TGIF and STRI users
Access Restriction:Certain MSU-hosted archive URLs may be restricted to legacy database members.
Publication Type:
i
Professional
Content Type:Q & A
Corporate Author(s):Sports Turf Research Institute
Title:School playing field construction - specification bill of quantities and site drawings
Section:Enquiries and replies
Other records with the "Enquiries and replies" Section
Source:Journal of the Sports Turf Research Institute. Vol. 35, 1959, p. 94.
Publishing Information:Bingley, West Yorkshire, UK: The Sports Turf Research Institute
# of Pages:1
Question:"We enclose the draft of our specification, bill of quantities and site plan relating to the construction of one of our school playing fields. These are based on the report and outline specification provided by you following your inspection of the site and we would appreciate your comments on the suitability of the documents."
Answer/Response:"We have studied the specification, bill of quantities and drawing and find them generally satisfactory though the following points are made: 1. An item indicating when the playing field contractor will be expected to start and complete work has not been included in the specification. We suggest you insert the following item under the heading "Scope of Work". "The contractor will take possession of the site on the 1 March, 1959 and must start active work within fourteen days of this date. All specified work and the seeding shall be completed by the end of August, 1959". 2. Your intention that the playing field contractor should use surplus excavations from the school site in completing the grading work on the playing field is satisfactory but we wonder whether these materials will be available when he requires them. We would expect the playing field contractor to need the surplus sub-soil around the end of April. Perhaps you would check that it will be available by this time. Regarding the site drawing. We have slightly altered the pitch layout, i.e. we have positioned the running track so that the 100 yd. straight can be sited on level ground. The long jump has also been moved so that it is on level ground. In the case of the high jump, to get a level area, a slight cut will be required across its width. We trust these points are clear."
Language:English
References:0
ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete):
Sports Turf Research Institute. 1959. School playing field construction - specification bill of quantities and site drawings. J. Turfgrass Sports Surf. Sci. 35:p. 94.
Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=112435
If there are problems with this record, send us feedback about record 112435.
Choices for finding the above item:
Web URL(s):
https://stri.lib.msu.edu/vol35-1959/pdf/sptri59035090.pdf#page=5
    Last checked: 07/07/2006
    Requires: PDF Reader
    Notes: Available to TGIF and STRI users
Find Item @ MSU
MSU catalog number: SB 433 .A1 S63
Request through your local library's inter-library loan service (bring or send a copy of this TGIF record)