| |
Publication Type:
| Trade |
Corporate Author(s): | LOBB Sports Architecture |
Title: | Aintree: The new completed new grandstand at Aintree required that some intricate details were ironed out at the design stage . |
Section: | Architecture Other records with the "Architecture" Section
|
Source: | Panstadia International Quarterly Report. Vol. 5, No. 2, August 1998, p. 24-25. |
Publishing Information: | Castle Donington, Derbyshire, UK: Panstadia Publishing Co. Ltd. |
# of Pages: | 2 |
Abstract/Contents: | Discusses some history of the Aintree Racecourse. Details on how the design was generated. Gives a detailed floor to floor description of each level in the racecourse. |
Language: | English |
References: | 0 |
Note: | Pictures, color Sketch |
| ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete): LOBB Sports Architecture. 1998. Aintree: The new completed new grandstand at Aintree required that some intricate details were ironed out at the design stage .. Panstadia Int. Quart. Rep. 5(2):p. 24-25. |
| Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=55557 |
| If there are problems with this record, send us feedback about record 55557. |
| Choices for finding the above item: |
| TIC Vertical - Serial |
| Request through your local library's inter-library loan service (bring or send a copy of this TGIF record) |