| |
Web URL(s): | http://archive.lib.msu.edu/tic/stnew/article/2015spr.pdf#page=1 Last checked: 10/06/2015 Requires: PDF Reader Notes: Item is within a single large file |
Publication Type:
| Newsletter |
Author(s): | Charbonneau, Pam;
Hartwig, Emily |
Author Affiliation: | Charbonneau: Retired; Hartwig: Summer Experience Student, OMAFRA |
Title: | Sports Field Benchmarking and Permitting Hours Verification Project |
Source: | Sports Turf Manager [STC]. Vol. 28, No. 1, Spring 2015, p. 1, 7, 9-18. |
Publishing Information: | Guelph, Ontario, Canada: Sports Turf Canada |
# of Pages: | 12 |
Keywords: | TIC Keywords: Benchmarking; Construction specifications; Evaluations; Sports turf construction; Sports turf management; Time management
|
Language: | English |
References: | 2 |
Note: | Partial reprint appears in SportsTurf, 31(8) August 2015, p. 14-17 Pictures, color Figures Tables Graphs |
| ASA/CSSA/SSSA Citation (Crop Science-Like - may be incomplete): Charbonneau, P., and E. Hartwig. 2015. Sports Field Benchmarking and Permitting Hours Verification Project. Sports Turf Manager [STC]. 28(1):p. 1, 7, 9-18. |
| Fastlink to access this record outside TGIF: https://tic.msu.edu/tgif/flink?recno=259582 |
| If there are problems with this record, send us feedback about record 259582. |
| Choices for finding the above item: |
| Web URL(s): http://archive.lib.msu.edu/tic/stnew/article/2015spr.pdf#page=1 Last checked: 10/06/2015 Requires: PDF Reader Notes: Item is within a single large file |
| MSU catalog number: b3497810a |
| Request through your local library's inter-library loan service (bring or send a copy of this TGIF record) |